China Product Development Agreements: Who Owns the IP You Paid For?

China Product Development Agreements: Who Owns the IP You Paid For?

Trademark

That is not a contract trick. It is a default in Chinese law, triggered by two words in a heading — and neither party chose it deliberately.

The short version: a development agreement decides in advance who owns what you paid to create. If it says nothing, every default lands on the developer’s side. The label — commissioned or cooperative — decides which default you are fighting. Ten clauses fix it; three of them do most of the work.

Two labels, two completely different defaults

Commissioned development 委托开发Cooperative development 合作开发
Who does the workYou specify, you pay, the other side developsBoth sides contribute work, cost or technology
Default patent rightThe developer (Art. 859)Jointly owned (Art. 847)
What that means in practiceYour money, their name on the applicationThey can use it and license it to your competitors; you cannot stop them

Joint ownership sounds safer than it is. Under PRC patent law a co-owner may exploit the invention itself and license third parties, so “we share it” usually means “they use it and you pay for the argument.” Some suppliers draft “cooperation agreements” for exactly this reason. The cure is identical in both cases — an express ownership clause — but you must know which default you are overriding, because the other side will argue whichever default favors them.

In short: read the title of the draft before you read the clauses.

Three blanks that cost buyers the IP

Blank 1 — ownership. Silence means the developer keeps the patent application (Art. 859), keeps a right to use and transfer unagreed know-how (Art. 861), and keeps the copyright in the design files (Copyright Law Art. 19).

Blank 2 — source files. Contracts routinely promise “drawings and samples,” which is not the same as editable CAD/design files. A buyer without source files cannot move production even when the IP clause is perfect: the design exists, it is just locked inside the factory’s system.

Blank 3 — improvements. The factory’s process improvements during mass production are often the most valuable layer of the project. Unmentioned, they belong to the factory.

In short: ownership, files and improvements are three separate clauses. Winning one does not win the others.

The ten clauses, and what each one prevents

ClauseWhat it prevents
1. Exclusive ownership from creationThe factory filing in its own name between finishing work and signing papers
2. Registration duty and cost splitRights that exist only on paper, unenforceable against anyone else
3. Source file deliveryOwning the design but not the ability to manufacture elsewhere
4. Payment against acceptancePaying in full before the deliverables exist
5. Improvements vest in the buyerThe factory owning the production layer you financed
6. Background IP license, narrowEither side claiming the other’s pre-existing technology
7. No subcontracting without consentAn additional owner you never contracted with
8. Non-infringement warrantyA third-party claim landing on you after delivery
9. Confidentiality during developmentInterim drawings leaking before the product ships
10. Survival after terminationWinning the ownership fight and losing it at exit

Three clauses that carry the most weight

Put these in the contract verbatim, with the Chinese text drafted on your side.

Ownership

“All results of the development — inventions, designs, copyrights, technical secrets, drawings, source files, test data — belong exclusively and irrevocably to the Buyer from the moment of creation, whether or not registered. The Seller retains no right to use them except as licensed in Clause 6.”

中文要旨:“开发成果(发明、外观设计、著作权、技术秘密、图纸、源文件、测试数据)自创作完成之时起独占、不可撤销地归买方所有,无论是否登记;除许可条款外卖方不保留使用权。”

“Whether or not registered” closes the gap between finishing the work and filing the paperwork.

Source files

“The Seller shall deliver all source files, CAD/CAM data and design files in editable formats, with any passwords or technical dependencies needed to use them, at each acceptance milestone and in any event on termination, at no extra charge.”

中文要旨:“卖方应在各验收节点交付全部源文件、CAD/CAM 数据及设计文件的可编辑格式,并附使用所必需的密码或技术依赖说明;终止时无论验收进度如何均应交付,不另行收费。”

Improvements

“Any improvement, modification or derivative work relating to the Products, made by either party during or after the term, belongs exclusively to the Buyer, and the Seller shall assign it on request.”

中文要旨:“与产品相关的任何改进、修改或衍生成果,无论由何方在合同期内或期满后作出,均独占地归买方所有,卖方应按要求转让。”

In short: a development contract is judged by these three clauses, not by its length. The rest protects the money and the exit.

Red flags in the draft

  • Titled “Cooperation Agreement” while you fund everything — the joint-ownership default is now in play.
  • Ownership appears only in a purchase-order annex, or the draft postpones it “until acceptance.”
  • The deliverables list mentions drawings and samples, never editable source files.
  • The supplier wants to keep the patent application “in our name for practical reasons.” That is Art. 859 wearing a friendly face.
  • No documentation milestone exists, so payment completes before the files do.

Need help?

We draft and review development agreements for overseas buyers working with Chinese factories and design houses — ownership, registration, source-file delivery and exit mechanics. If you are about to pay for development, talk to us before signature.

Related reading

Sources (accessed November 2026): Civil Code of the PRC, Arts. 847, 859, 861; Patent Law (co-ownership rules); Copyright Law (2020 Amendment), Art. 19. 

Frequently asked questions

Q1: What is the difference between commissioned and cooperative development under Chinese law?

A1: In commissioned development you define the requirement and pay while the supplier develops; the default patent application right belongs to the developer (Civil Code Art. 859). In cooperative development both parties participate and share costs or technology; the default patent application right is joint ownership (Art. 847). Joint ownership is worse than it sounds — a co-owner can exploit the invention and license it to third parties. Both defaults are overridden by the same fix: an express ownership clause.

Q2: If our contract is silent, who owns the patent on a product my Chinese supplier developed?

A2: The supplier does, unless you agreed otherwise. Under Article 859 of the Civil Code, the right to apply for a patent on commissioned development belongs to the research and developer by default — even though you financed the work. Technical secrets are broader still: without agreement, both parties may use and transfer the results (Art. 861). Ownership shifts to you only if the development contract expressly grants it.

Q3: Do I own the improvements the factory makes during mass production?

A3: Only if the contract says so. Process improvements made during production are often the most commercially valuable part of a project, and without an improvements clause they accrue to the factory by silent default. The clause should state that improvements and derivative works relating to the products belong exclusively to the buyer, created by either party, during or after the agreement’s term.

Q4: What is background IP in a China development agreement?

A4: The supplier’s pre-existing tools, platforms and general manufacturing know-how that existed before your project and can be reused across customers. The fair split: the supplier keeps background IP and grants you a perpetual, royalty-free license limited to use as embedded in your products; everything created under your project and paid by your money (foreground IP) is yours outright, from the moment of creation.

Q5: Should the development contract require IP registration in China, or is ownership enough?

A5: Registration is what makes ownership work against everyone, not just the contract counterparty. A Chinese patent, design patent or copyright registration in your name supports customs seizure, injunctions and platform takedowns — including against your own factory. The contract should obligate the supplier to execute filings in your name and allocate filing costs, ideally as fixed amounts.


Q6: What happens to the IP if I terminate the development contract early?

A6: Whatever the termination clause says, which is why it must be written. The working clause: on termination for any reason, the supplier delivers all results, source files, prototypes and materials whether or not the current milestone was accepted, and the ownership, registration, source-file, improvements, license, warranty, confidentiality and non-infringement clauses survive termination.

Disclaimer: This article is general information about PRC law, not legal advice, and no attorney–client relationship is created by reading it. PRC law and local practice change frequently — confirm before relying on this content. © 2026 Chibridge Law Firm / China Law Help.

Related Posts